Environment Clearance Services
Environmental clearance services in India refer to the regulatory processes and approvals required for various development projects to ensure their compliance with environmental regulations and sustainable practices. These services are governed by the Ministry of Environment, Forest and Climate Change (MoEFCC) and its various state-level counterparts.
The primary purpose of EC Services is to assess the potential environmental impacts of proposed projects and to ensure that appropriate mitigation measures are implemented to minimize any adverse effects. The clearance process aims to strike a balance between development and environmental conservation.
When Environment Clearance Certificate Required:
If EC Certificate required on your project then you can start construction of the project only after EC Certificate obtain , The EC certificate certifies that the project will not harm the environment or society.if you run Project Activity/Construction without EC Then Your Project applicable under Violation of EC Rules act.
Which Project EC Permission Applicable
EC Permission Applicable to Project list cover Under EIA Notification 2006 and its amendment(Residential and Commercial Construction Project more than 20,000 sq.mt, Mining, Industrial), There is two type of project A or B(B1 or B2), MoEF gives clearance to category A projects and Category B is given clearance by the SEIAA, i.e. State Environment Impact Assessment Authority.
EC Certificate Exemption
EC Certificate Exemption is applicable for those industries or projects considered to have a low risk of environmental pollution and notified by the regulatory authorities
Environment Clearance Permission Process
- Category B Project:
- Data Collection and Application Prepare and Apply
- Category identification & Application Verify by Committee
- Presentation
- Approval
- Category A Project
- Data Collection and Application Prepare and Apply
- Category identification & Application Verify by Committee
- Presentation
- TOR
- EIA report
- Final EC Certificate
Environmental Clearance Services Process Time: 90 days
How To Alep team Help
We have technical staff who have more than 10 year experienced and done all type various project like Construction Project(Built up area more than 20,000 sq.mt),Mining project, Industrial Project. You just have to provide the required documents/details, we will doing the rest of the process And we will bring you the final EC certificate permission.
EC – Environmental Clearance
- TOR application (Form-1 & Prefeasibilty report) to be submitted/uploaded on MoEFCC portal (Parivesh)
- Receipt of acknowledgement regarding above stated application from MoEFCC portal
- Scrutiny & essential details sought by Ministry / SEIAA/SEAC
- Receipt of acceptance by Ministry/ SEIAA/SEAC for TOR process
- Submission of hardcopy of application to Ministry/ SEIAA/SEAC
- Invitation for presentation regarding the project to Ministry / SEAC
- Additional details sought by Ministry / SEIAA/SEAC
- TOR issuing by Ministry /SEIAA/SEAC for EIA/ EMP studies
- EIA/EMP studies and draft report preparation as per the TOR
- Draft EIA/EMP report and executive summary submission to GPCB for Public Consultation (if applicable)
- Public Consultation/ Hearing (if applicable) to be conducted by SPCB/ GPCB
- Final EIA/EMP report including public heraing minutes and executive summary
- EC application (Form-2, EIA and related documents to be submitted/ uploaded on MoEFCC portal (Parivesh)
- Receipt of acknowledgement regarding above stated application from MoEFCC portal (Parivesh)
- Scrutiny & essential details sought by Ministry / SEIAA/SEAC
- Receipt of acceptance by Ministry /SEIAA/SEAC for EC application
- Submission of hardcopy of EC application / EIA EMP report to Ministry /SEIAA/SEAC
- Invitation for EIA presentation / appraisal regarding the project to Ministry /SEAC
- Additional details sought by Ministry / SEIAA/SEAC
- Recommendation by Ministry / SEAC for grant of Environmental Clearance
- Grant of Environmental Clearance by Ministry /SEIAA
- Providing Technical Guidance for Liaison with Authority.
- Submission of compliance report to the Authority for the requirement given in EC with Monitoring and Analysis.
- Certification of Registered Recycler.
- Filling all online returns of GPCB.
- Technical correspondence with the Authority for the compliance of the legal issues.
- Environmental Study Reports For
- EMP – The Environmental Management Plan (EMP) covers the design, construction, commissioning, and operation and maintenance phases of each project component. The EMP identifies the key environmental issues across the project and provides strategies and plans for managing them effectively.
- Environmental Audit Report – Environmental audit reports are statutory documents and are issued after a statutory environmental audit of a property or site has been conducted under the Act.
- Treatability Report A treatability study is based on carefully designed laboratory-scale experiment that is intended to mimic full-scale conditions as closely as possible
- EMS Adequacy Study Report –– It is to develop and approve the environmental policy as a statement of commitment.
- PESO Registration